Meilan Airport Phase II T2 Terminal Works With JONCHN Intelligent Fire Control to Build the Largest Airport Duty-Free Business District in China

Transportation is the key to rejuvenating the country and the foundation of strengthening the country. The transportation extending in all directions has not only reshaped the space-time pattern of China, but also become a powerful engine of economic development.

1

Recently, JONCHN has provided intelligent fire evacuation solutions for Meilan Airport Phase II T2 terminal project, showing its skills in actively responding to the national "the Belt and Road" strategy.

2

Meilan Airport is determined to be the eighth in the world and the first "SKYTRAX five-star airport" in China (excluding Hong Kong, Macao and Taiwan). It covers an area of 300,000 square meters and is 550 meters away from the existing T1 terminal as the crow flies. It is mainly composed of the main building, southwest corridor, northwest corridor, southeast corridor and northeast corridor. T2 terminal has 5 check-in islands, 110 check-in counters, 32 domestic security channels and 12 international security channels. The total commercial area is about 33,000 square meters, among which the duty-free commercial area is 10,600 square meters. It will be the largest duty-free commercial area of the airport in China after it is put into use.

 

3

The completion acceptance of Meilan phase II T2 terminal project is organized by Meilan Airport Phase II expansion headquarters, and an acceptance team is formed by 7 enterprises, including construction, survey, design, supervision and construction, to jointly conduct on-site acceptance of non civil aviation professional projects such as buildings, structures, curtain walls, roofs, decoration and repair, gardens, electrical, drainage, HVAC engineering and engineering materials in the central area of T2 terminal and the four corridors.

4

Haikou construction project quality and safety supervision station and members of the acceptance team of all parties comprehensively and carefully reviewed and demonstrated the acceptance content, and deeply discussed and exchanged the conclusion of project quality acceptance. After summarizing and sorting out, a consensus acceptance opinion was formed: the acceptance of the terminal project completed the contract content, met the design requirements, met the functional use requirements, and passed the completion acceptance.

 

5

Over the years, JONCHN has been deeply engaged in the research and development of intelligent evacuation, with more than 100 engineering and R & D personnel. It has successfully created the business card of intelligent evacuation guardian in the fire industry, and continues to help China's intelligent evacuation industry achieve steady development. JONCHN will strictly abide by the quality of each product and use innovation to help make breakthroughs. In front of quality, he will resolutely not be a "Mr. almost"!

6

In the future, JONCHN will, as always, adhere to technological innovation, make products with ingenuity, and strive for a higher level in a new round of development. Wish Meilan Airport a smooth opening and operation!


Post time: Jul-20-2022